Traffic Incidents related to Princes Highway on Batemans Bay Bridge, Batemans Bay, NSW
Motorists can use the bridge to cross Clyde River.
Alternating (stop/slow) traffic control in the southbound lanes.
The bridge lift will take place from 11:45am to 11:55am. During this time, traffic approaching the bridge in both directions will be stopped. Allow up to 15 minutes extra travel time.
The bridge lift is expected to be back in operation for the 11.45am lift today - to be confirmed this morning.
The bridge lift is not operating to maintain accessibility for emergency services and to prioritise safety.
The Batemans Bay bridge will not be opening to vessels, to allow continuous road access along the Princes Hwy.